Appendices
- Introduction
- Appendix A: The Master Planning Process
- Base Map Preparation
- Inventory/Analysis
- Planning Workshop
- Exploration of Primary Issues
- Conceptual Alternatives
- Campus Spatial Diagram and Conceptual Preliminary Master PlanPreliminary
- Master Plan and Site Specific Studies Final Plan
- Appendix A1: Initial Workshop Questions (PDF)
- Appendix A2: Master Planning Workshop Participants (PDF)
- Appendix A3: Initial Master Planning Workshop Summary (PDF)
- Appendix A4: Conceptual Alternatives Survey and Feedback (PDF)
- Appendix B: Campus Utilities and Infrastructure
- Inventory
- Electrical Service
- Power Distribution
- Uninterruptible Power Systems
- Site Roadway, Pathway, and Parking Lighting
- Central Heating and Cooling Plant
- Chilled Water
- Recommendations
- Implementation
- Inventory
- Appendix C: Non-Campus Entities
- Appendix D: Demographic Survey
- Appendix E: Spatial Standards for Roundabouts
Illustrations
- Drawings
- Completed Circle Template
- Completed Circle Concept
- South Campus Drive Template
- South Campus Drive Concept
- Inner Loop Road Template
- Inner Loop Road Concept
- Parking Streets
- Campus Spatial Diagram
- Conceptual Master Plan
- Preliminary Master Plan
- Demographic Survey
- Demographic Survey
- Green Bay Metro Route
- Urban Compact Roundabout
- Urban Double Roundabout
- Additional Roundabout Configurations
- Photographs
- Tables