Master Plan > Recommendations and Implementation Strategies > Primary Planning Issues > Circulation and Wayfinding >
Major Bicycle Routes
Recommendations:
- Install primary bicycle routes along major ingress/egress points
- Mark paths on roadway with 5’-0” minimum width
- Create easement along major access roads to campus for future development of separated bicycle path if use warrants
- Create the primary inner-campus bicycle route via the Inner Loop Road
- Make pathways parallel to pedestrian sidewalks 8’-0” wide
- Separate pathways from pedestrian sidewalks using bollards or landscaping buffers
- Locate pathways that accommodate two-way bicycle traffic along the outer edge of the Inner Loop Road
- Use pavement materials and lighting consistent with the design guidelines for pedestrian walk-ways along the Inner Loop Road.
- Provide bicycle parking and racks at major entry points to campus as well as outside of major ac-cess points to buildings
Implementation:
- Coordinate multimodal transportation system along roadways with City of Green Bay, Brown County, and Wisconsin Department of Transportation
- Construct bicycle lanes incrementally as part of the Inner Loop Road project
- Replace or add new fixtures along pathways to comply with International Dark-Sky Association Standards
- Research outside funding sources (i.e. private grants) to implement part or all of multimodal program

Major Bicycle Routes
This plan and section view depicts the widths and locations of bike lanes in relationship to elements such as pedestrian walkways and the Inner Loop Road.