UW-Green Bay Permit-Required Confined Spaces
Confined Space Program
Air Sampling Procedures
Download:
UW-Green Bay Confined Space Entry Program
Appendix A: UW-Green Bay Permit-Required Confined Spaces
Appendix B: UW-Green Bay Confined Space Entry Form
Appendix C: Air Sampling Procedures
| Description of permit space | Department staff entering space |
| Sanitary sewers | No UW-Green Bay staff, outside contractor |
| Storm sewers | Maintenance |
| Elevator pits | Maintenance, outside contractor |
| Sump pump pits | Maintenance, Heat/Chill |
| Water irrigation (soccer pump house) | Heat/Chill, Grounds |
| Water filter (PSC) | Maintenance |
| Stage lift pit | Weidner |
| Orchestra pit | Weidner |
| Scenery painting pit (TH) | COA Theater |
| Clay Pit (SA) | Maintenance |
| Communication Pits | Technical Services |
| Boilers # 1,2,3 – Mud drum, Steam drum, Fire box, Stack (Power Plant) | Heat/Chill |
| Boilers # 4,5 – Fire box | Heat/Chill |
| Condensate tank (Power Plant) | Heat/Chill |
| Deairator tank (Power Plant) | Heat/Chill |
| Sump Pump (Power Plant) | Heat/Chill |
| Cooling Tower Flume (Power Plant) | Heat/Chill |
| Electrical Vault (Power Plant) | Heat/Chill |
| MACH Steam Pit | Heat/Chill |
| Sports Center Steam Pit | Heat/Chill |