CHANCELLOR’S REPORT

 

DISCUSSION ITEM

1. Strategic Budgeting at UW-Green Bay (most recent version attached).  Presented by Professor John Lyon

 

INFORMATION ITEMS

1. Proposal for an Extended Degree Faculty (attached)  Presented by Professor John Lyon

2. Report of the Provost  Presented by Provost Sue K. Hammersmith

3. University Committee Report   Presented by Professor John Lyon, Chair

 

NEW BUSINESS

 

ADJOURNMENT


MINUTES 

UW-GREEN BAY FACULTY SENATE MEETING NO. 6

Wednesday, February 19, 2003

Phoenix Room C, University Union, 3:00 p.m.

Presiding Office: Illene Noppe, Speaker

Parliamentarian: Jerrold Rodesch, Secretary of the Faculty and Academic Staff

PRESENT

Clifford Abbott

Forrest Baulieu

Derryl Block

M. Jan Bradfield

James Coates

Kevin Fermanich

Scott Furlong

Sue Hammersmith

Craig Hanke

Aeron Haynie

Michael Hencheck

Curt Heuer

Ray Hutchinson

Andrew Kersten

Anne Kok

Sylvia Kubsch

William Lepley

Richard Logan

Dennis Lorenz

John Lyon

John Mariano

James Marker

E. Nicole Meyer

Illene Noppe

Gilbert Null

Jennifer Popiel

Joyce Salisbury

W. Bruce Shepard

Linda Tabers-Kwak

Patricia Terry

NOT PRESENT: Robert Nagy

REPRESENTATIVES: John Rumpel, Student Government Association, and John Landrum, Academic Staff Committee

GUESTS: Dean Carol Blackshire-Belay, Interim Dean Jane Muhl, Interim Associate Dean Lloyd Noppe, Associate Provost Timothy Sewall, Associate Provost Sue Keihn, Associate Provost Kathy Pletcher, Assistant Dean Steven Neiheisel, Director of Marketing and Media Relations Scott Hildebrand Director of Outreach and Extension Jan Thornton, and Professor Kenneth Fleurant.

 

AUTOMATIC CONSENT

1. Approval of Minutes of UW-Green Bay Faculty Senate Meeting No. 5, January 22, 2003

The minutes were approved without change.

 

CHANCELLOR’S REMARKS

The Chancellor addressed the Governor’s budget proposal announced on February 18. He had previously distributed an e-mail on the subject. The budget plan is unfair to the University of Wisconsin. We have been singled out, taking a disproportionate share of the pain. We are politically vulnerable. Our supporters need to get organized, as those of other interests are.

The Governor is on-record that he believes higher education is part of the solution to Wisconsin’s long-term economic problems, that budget cuts should be fairly distributed, and that the pain should be concentrated in the first two years. What he has now proposed is unfair. The Governor would reduce UW funding by $250 million in the biennium. The University is responsible for 9.3 percent of the budget. We are to take 38 percent of the GPR cuts.

The Governor’s proposal to authorize increased tuition for a partial offset of lost GPR was a difficult choice for a Democratic Governor. A significant increase in financial aid will somewhat soften the effects of the tuition hike. If the tuition authority is approved and fully used ($250 per semester in each year of the biennium) the effect on UWGB will be a funding reduction of probably about 5 percent. If the tuition increase doesn’t occur, we will have to absorb something like a 10 percent cut. The latter would be a disaster. The Chancellor invited questions and discussion.

Senator Null said that junior faculty are anxious about the budget news. We may lose some of our most talented people unless we can give them some assurances. The Chancellor acknowledged the problem. He believes that tenured faculty are secure and tenure-track faculty are our next priority. But whether our cut is 5 or 10 percent will determine what we are able to do. Senator Furlong noted that students could receive double hits on the tuition increases as budget reductions could mean reduced course availability causing them to take longer to graduate (paying the higher tuition for additional semesters). Yes, said the Chancellor, but note that the demand for higher education is very high and there is room to increase tuition; other states are raising tuition even more. The problem lies with tuition’s impact on the poor. If tuition gets too high and GPR support for financial aid proves inadequate, access to public higher education will be meaningless for any but the middle and upper classes. This would be immoral. In order to maintain our standards and to offer students what we have promised, including the ability to graduate in a timely fashion, we need to be prepared to manage our student numbers. The worst-case scenario--that there would be no tuition offset to the budget cut--would mean 22,000 fewer students in the UW System. Even with the tuition offset, we are looking at a reduction of 6,000.

Senator Kersten asked what is being done now to cope with the cuts, pending a clearer idea of the dimension of the cuts by the end of March. It is frustrating to take part in the searches for new faculty not knowing if offers can be made. Provost Hammersmith replied that no offers can be extended until a budget review is completed to plan reductions. When we have identified what is necessary to manage the cuts, then offers will be possible. She understood the danger of losing promising candidates. The Chancellor said that he wanted the searches to go forward, but we had to be sure that funds would be available to fill specific positions before authorizing offers. Different scenarios need to be studied to reach this point in the absence of exact budget figures.

Senator Abbott asked if there is to be a systemwide response to the budget proposal or if each campus is to respond. Both, said the Chancellor. In particular, UW System Administration will arrange hearings on each campus about the consequences of the budget crisis, the Green Bay one to be held in March.

 

ACTION ITEMS

1. 2003-04 Slate of Nominees for the Faculty Elective Committees

Presented by Professor Kenneth Fleurant, Chair, who first noted a change in the document previously distributed listing nominees for elective committees. Two nominees for the Academic Affairs Council are not in fact eligible for membership in 2003-04 (Professors James Marker and Marilyn Sagrillo) and their names have been replaced by Professors John Lyon and Francine Tomkins. Fleurant reminded the Senate that additional nominations may be made, either from the floor of the Senate, or by petition (by February 28) of three faculty members with the consent of the nominee. No nominations were forthcoming from the Senate, and the slate of nominees was accepted without objection.

 

INFORMATION ITEMS

1. Strategic Budgeting at UW-Green Bay

Presented by Professor Andrew Kersten who serves as Chair of the Senate Budget and Planning Committee. He summarized the charges to that committee: 1) problem-solving or dealing with specific issues (e.g., salary compression); and 2) providing information and advice in the budget-building process. The last has been the focus of committee work this year, which led to meetings with the Chancellor, Assistant Chancellor, and Provost who have provided the draft statement on Strategic Budgeting previously distributed to the Senate. There is a need to better connect faculty to budget building. Kersten highlighted several of the Strategic Budgeting Principles contained in the draft statement: it is a bottom-up approach, beginning with the departments and flowing upwards; it is transparent; it is flexible. The process mirrors the already-existing governance structure and can help integrate the strategic and operational budget planning processes. However, a new committee is called for, a Strategic Budgeting Committee. This is the how new faculty ideas and initiatives can be introduced into budget planning. We should begin implementing the new approach now. He asked for questions and comments.

Senator Kubsch asked if the new committee would be elected or appointed. Appointed, at first, Kersten said. Eventually it would be elected. There is only one faculty member on the proposed committee, although, as Senator Salisbury pointed out, that person would serve as chair. Senator Popiel thought that one faculty member was inadequate to improve communication significantly. Chancellor Shepard said that the faculty chair would be expected to work closely with the University Committee. Indeed, said Senator Lyon, the person might be an ex-officio member of the University Committee. Kersten said the person would also serve on the Senate Budget and Planning Committee. Course reassignments may be necessary to support this important position. The Chancellor said that this is still in the pilot stage and that such details would be worked out over time. The important thing is to begin addressing key planning issues now.

Senator Abbott raised a concern about bottom-up planning. If units were encouraged to generate initiatives, it might undermine our interdisciplinary mission, creating turf-battles in the planning process itself. We depend on a culture of cooperation, which is hard enough within the present structure. We need a broader-based planning process, not one controlled by the units. Kersten said he expected that planning guidelines would be set on a university-wide basis and used by the units. The Chancellor thought that Arts and Sciences and Professional Studies would be the two basic planning units. Abbott remained wary. Provost Hammersmith said that we don’t know how this model will work out. It needs to evolve over the next three years. The interdisciplinary mission needs a structure that will bring people together to identify common purposes and to work these into the budget process. The level at which this functions best needs to be worked out. Strategic budgeting is a university-level operation, but there is a role in this for departmental and college-level planning.

Senator Marker asked what change the proposal would really make if units would continue as they do now to direct budget proposal to the deans. Kersten said that the proposal built upon many current practices. Salisbury noted that the difference was that faculty would participate in budget planning at a higher level than before. The Chancellor added that the proposal would make university priorities more explicit. Let’s try it, pleaded Kersten. It’s a good idea for a pilot.

2. Report from the First-Year Experience Committee

Presented by Professor Scott Furlong, who co-chairs the committee with Brenda Amenson-Hill, Assistant Dean for Campus Life. He distributed a handout to the Senate summarizing the FOCUS program (First-year Opportunities and Connections for UWGB Students) developed by the committee. FOCUS seeks to increase opportunities for student interactions on campus and integrate SOAR, Introduction to College and other activities for first-year students. A first-year fee of $200 (a combination of the SOAR and Introduction to College fees at the current level) will help accomplish this. Improved marketing will also. A student leadership program will integrate hiring of students to help in the entire range of first-year activities. A web site for incoming students will soon be operational.

Senator Popiel asked what provision had been made for transfer students. None. This is being treated as a separate question, Furlong said. Senator Salisbury praised integration, but asked about scheduling. SOAR and registration occurred earlier before and lasted longer, permitting alterations in our course offerings. What now? Furlong said that it could be a problem in future, but there were practical reasons to try the change. Senator Block, noting the new fee--which would cover participation by all new freshmen in SOAR and Introduction to College--asked what had been the level of participation in each program in the past. More than 90 percent of incoming freshmen in SOAR and 62 percent in Introduction to College last year, said Furlong. Senator Marker disliked the idea of a new fee requirement. Couldn’t there be a provision to opt out of FOCUS? No, said Furlong. It was an opportunity for all, and all will pay. There are also other events and services provided during the first year. Senator Popiel thought it was a good plan. Senator Hutchinson said that students who have taken part in SOAR and Introduction to College clearly benefited from it.

3. Report of the Provost

The Provost had distributed her report in writing in advance, hoping that the Senate would then be prepared to question and discuss it. She had also sent out a draft statement of budget reduction principles. She hoped for feedback about this as well. It turned out that several Senators had not opened the e-mail attachments that contained the Provost’s documents.

Senator Popiel thanked the Provost for her decision to cut some activities planned for the Learning Experience initiative. Popiel appreciated that the Provost had listened to faculty concerns. Senator Kersten noted that the Provost’s principles included seeking outside funding. This might suggest expansion of the campus grants office. Can this be done? The Provost said that this is the kind of item that the new budget-planning model could put on the table. She currently does not have an expansion plan for the grants office, but she would like to promote wider interest in external funding. Senator Salisbury appreciated receipt of the budget draft. But she and her colleagues had questions, particularly with respect to the possibility of academic program elimination. Theoretically, the Provost said, this is always on the table. A decade ago many institutions had eliminated programs in very painful and unproductive ways. It makes more sense to develop and reduce programs gradually. The Chancellor agreed. Strategic budget planning is a slow process, a long-term planning continuum that should avoid unneeded pain. Sudden action to eliminate programs can damage an institution for a long time.

4. University Committee Report

Presented by Professor John Lyon, Chair. He summarized University Committee business:

· The Senate’s discussion at the last meeting about problems with information technology led to a very prompt responses. Associate Provost Kathy Pletcher addressed faculty concerns as follows:

1) the Help Desk (ext. 2309) will be the point of first contact for all technology questions;

2) a discussion list on the List Serve will be implemented to share problems and solutions;

3) the CIT web page will offer Frequently-Asked-Questions (and answers) to provide information and successful solutions to problems identified by faculty and others.

Lyon expressed his appreciation at the speed and thoroughness of this solution. He congratulated Pletcher.

· The University Committee continues to work on improving communication between major faculty committees and councils and the UC and Senate. In particular, the Committee had a recent discussion with the General Education Council concerning evolution of the general education program. The GEC will soon undertake a survey of faculty for information and advice about the program.

· The University Committee supports the strategic budgeting initiative and recommends that the faculty member who chairs the Strategic Budgeting Committee should hold tenure. Lyon believes that the person should be elected for a three-year term. He also prefers that the person be a member of the University Committee even if only ex-officio.

· Lyon’s meetings in Madison have alerted him to the need to explain and defend the tenure system, and that new Regents in particular need to be educated about this. UW System Administration is preparing a statement on tenure. Faculty Representatives have provided advice. This is not a response to an attack on tenure, but rather an effort to explain to people outside of higher education the role and importance of tenure in the UW System.

· The Faculty Representatives also discussed the need to increase efficiencies in the UW System and to eliminate weak programs in order to support strong ones. Lyon is opposed to such a principle, which he regards as the least creative and easiest way out of budget problems.

· The University Committee agenda for the remainder of the year will include: implementing the Strategic Budget plan; improving communications among faculty governance bodies; considering changes in the language of our code governing open meetings; dealing with issues in the Extended Degree program; and selecting a new Secretary of the Faculty and Academic Staff.

 

ADJOURNMENT

There being no new business, the meeting adjourned at 4:45 p.m.

Respectfully submitted,

Jerrold Rodesch,

Secretary of the Faculty and Academic Staff


PROPOSAL

FACULTY EXECUTIVE COMMITTEE FOR THE EXTENDED DEGREE PROGRAM

 

The University Committee recommends the formation of a Faculty Executive Committee for the Extended Degree Program. The Committee will be charged with the following responsibilities:

a. to oversee all phases of the Extended Degree academic program, including, but not limited to, graduation requirements, curriculum and quality of instruction.

            b. make recommendations to interdisciplinary home units for renewal, tenure, and promotion reviews of all faculty teaching in the program.  

            c. to examine the mission of the program.

Faculty Executive Committee for the Extended Degree Program would consist of the tenured faculty participating in the program. Having their participation listed in their letters of appointment in any given year would determine their right to serve on the committee. Faculty would have the right to decline membership on this committee. Additional committee members may be appointed by the Dean of Liberal Arts and Sciences upon the positive recommendation of the Faculty Executive Committee.

In questions of authority over curricular matters, the Faculty Executive Committee for the Extended Degree Program will defer to all other academic programs.


Provost’s Report to the Faculty Senate

Sue K. Hammersmith

Provost and Vice Chancellor for Academic Affairs

University of Wisconsin-Green Bay

March 3, 2003

 

I.  DEAN’S CANDIDATES TO BE INTERVIEWED

Three excellent candidates for the position of Dean, Professional and Graduate Studies, have accepted our invitation for on-campus interviews.  They are:

Fritz Erickson will be with us on Wednesday, March 12, and Thursday, March 13.  His campus open forum will be Thursday, March 13, 10:00-11:00 AM, in Niagara Room B.  Dr. Phillips and Dr. Mills will be with us for the on-campus interviews shortly after we return from spring break.  I encourage all Senators to participate in the interview process, as your schedules permit, and to provide feedback to the search committee.  This will be an important hire for all of us.  I am delighted that we have a strong pool, but that means we need everyone’s help in selecting the candidate who will be “just right” for UWGB.

Detailed announcements about the candidates and their interview schedules will be forthcoming through the Log.  Abbreviated summaries of their curricula vitae will be available on the Provost’s home page or by hard copy during their interviews.  The full curriculum vitae for each candidate is available upon request from Judy Parins in the Provost’s office (#2334).

Many thanks to Marilyn Sagrillo (chair) and other members of the Dean’s Search Committee.  They worked on a tight time line to filter through an impressive, robust pool of candidates to bring forward three for on-campus interviews.  They have been wonderful to work with, and I look forward to completing this process with them.

 

II.  BUDGET REDUCTION DISCUSSIONS

UW System has given each institution a target number of positions which we must delete to help system achieve its mandate of reducing 650 positions.  We also have received a figure for mandatory one-time budget reductions in the first year of the biennium.  We are estimating the target reduction which we must achieve in our on-going base budget, but that’s been a bit of a moving target as more information and clarifications come from system.  The budget reduction  targets assume that the legislature will permit the tuition increases recommended by the governor, that our enrollments will remain healthy, and that we won’t have further “surprises” on the budget front in Madison.

Here at UWGB, the position and budget reductions were allocated out to the various budget divisions on a proportional basis.  In the Provost’s area, our targets are:

I have asked each area reporting to me to do a 5% budget reduction exercise.  I am working with the Dean of Liberal Arts and Sciences, the Interim Dean of Professional Studies and Outreach, the Associate Provost for Student Affairs, and the Associate Provost for Information Services to identify potential savings according to the principles I circulated to you earlier.  So far, we have identified ways to achieve much, but not all, of the required savings.  At this time, though, we are still going through the exercise of considering all options, and it would be premature to discuss specific scenarios.  Decisions have not yet been made.  Although I am asking everyone to do a uniform across-the-board 5% budget reduction exercise and expect that every unit will be affected in some way, I do not expect the actual reduction decisions to be across-the-board.  Rather, those decisions will be informed by broader discussion and will reflect a more deliberate set of priorities, needs, and choices.  The exercise is necessary, however, to more forward our consideration of options.

We also have asked units to look at their potential for generating additional revenues, and several constructive approaches are being considered.  These include initiatives in Student Affairs, Information Services, Outreach, and the academic units.  Such revenue enhancements also will be considered during the strategic budget-building hearings.

The Provosts from the various campuses have been in touch throughout the recent budget discussions.  Some campuses are also doing 7% or 10% budget reduction exercises.  No one has any magic solutions, and we’re all dealing with similar commitments and constraints.  We recently had a session with several members of the Board of Regents, which I think helped them to understand our options, constraints, and potential strategies.

 

III.  SPACE REASSIGNMENTS

On the academic side, several positive space reassignments have been achieved this semester: 

·     Learning in Retirement has moved from CL108 to Wood Hall 116-118—closer to parking and closer to the Outreach offices which offer the program.

·     CL108 was then reassigned to the English composition program, and CL110 was converted to offices for the composition instructors.  This achieves a wonderful arrangement for the composition program, with the Writing Center, faculty offices, and classrooms all together on the first floor of Cofrin Library.  (Some offices remain in Wood Hall at this time.)

·     The Dean of Professional Studies and Outreach and the Institute for Research recently moved into the CL730 suite, which is in direct proximity to two important PSO units (NEW Partnership for Children and Families, and the Social Work academic program).

·     NEW Partnership for Children and Families, a grant-funded program supporting social work agencies and professionals in Northeast Wisconsin, has moved into the CL750 suite (previously occupied by composition instructors), gaining two additional offices to house their grant-funded growth.

 

IV.  ACADEMIC PROGRAMS

Enrollments continue to grow in the new masters program in Management program as well as the masters program in Education.  Undergraduate programs with particular enrollment growth over the last five years include Communication and the Arts, Education, History, Human Development, Nursing, Psychology, and Theater.  We continue preparing to open the new Masters in Social Work program in Fall 2003, including a recent site visit by a Council of Social Work Education representative. 

The General Education Council is undertaking a program review of general education, including outcomes assessment. 

A group chaired by Mark Everingham is reviewing our curriculum in international education with the aim of developing a more coherent, problem-focused global studies curriculum.  This group also will look at developing an academic minor in Global Studies to replace the current certificate in International Education. 

 

V.  REGENTS’ LISTENING FORUM

Board of Regents members will be on campus Thursday afternoon, March 13, to hear from the UWGB community and the public about the importance of preserving quality public higher education in Wisconsin.  Their forum will be as follows:

Thursday, March 13, 2003

4:00-6:00 PM

Phoenix B

You are welcome to join this open forum as your schedules permit. 

If questions or comments, please get in touch (#2334; hammerss@uwgb.edu). 

Respectfully submitted,

Sue H.

Sue Hammersmith


 

 

DRAFT FOR DISCUSSION ONLY

3/10/2003

 

Strategic Budgeting and Budget-Building at the University of Wisconsin – Green Bay

Strategic Budget Planning Group [1]

Preface

This paper proposes, for purposes of discussion, a set of principles to guide and expedite the process of developing a strategic budgeting and budget-building process suited to our university.

At this stage, UWGB does not currently have a full-fledged strategic budgeting and budget-building process. We do, however, have resources to draw on. We have had almost a year of discussion that included meetings with our Office of Planning and Budget, the University Committee, the Academic Staff Committee, Cabinet, the Leadership Team, and the Senate Planning and Budgeting Committee; research on processes used at other universities; a "site visit" to another UW campus; what we have learned, sometimes painfully, in implementing budgeting/planning processes at multiple campuses; and review of current practices.

It has been our experience that discussion of planning processes eventually reach a point of rapidly diminishing return. We could talk for years, seeking to dot every "i" and cross every "t," and still not get it right. We reach a point where progress can be more quickly made by "doing" and learning from that "doing," trusting in our abilities as sensible human beings to critically examine and regularly adjust practices.  Thus we are suggesting that we implement the budget planning and budget-building structure outlined here immediately and alter it as we need to in the coming years. If we approach the budgeting process with an attitude of openness, integrity, collegiality, and responsiveness to campus needs, and if we make sure to include critical "feedback" loops, we’ll get better and improve the process as we go.

That is how we’d like to begin, by adopting a process that builds on what we’ve learned and what we’ve heard, and allowing for process improvements over the years. We can be certain that what we agree to for this year will different from what we do in subsequent years.  A key phase of any planning process is to analyze results of plans in order to regularly adjust and improve. That principle applies just as well to the very process of planning itself.

One final observation by way of preface. UW-Green Bay’s planning and budget-building processes needed attention and nurturing. Unfortunately, we are pursuing that objective in less than favorable circumstances. Large State budget deficits loom. The University will be affected. In such circumstances, anxieties understandably abound. The complications are two-fold. First, anxiety, fear, and frustration -- even anger -- can interfere with thoughtful, analytical, collegial discussion of what is best for the whole. Second, it may be that processes for routine strategic budgeting and budget-building will not always be suited to addressing situations that are extraordinary – for example, that require more rapid responses or that are driven by external forces. So, the circumstances for "bringing up" new procedures are not ideal. And yet, forging this process now in the worse case scenario may indeed be useful and productive. By going ahead now, we will know that this process that we are creating will have survived trial by fire and that the structure will work in good times and bad times. We need to acknowledge and be prepared to deal with these potential additional complications. But, we should not and cannot postpone. Arguably, it is precisely at times such as we are entering that we need to emphasize the integration of short-term budgetary decisions with longer-term strategic directions. 

 

I. What is Strategic Budgeting and Budget-Building?

Any budget says what fiscal resources we plan to have and how we plan to use them. A strategic budget, however, is much more deliberate than that. It is an aspect and form of strategic planning. It is driven, at its core, by imagination, even passion, and a desire for change. It looks at desired changes and improvement efforts, determines what resources we have to work with, and figures out how we can deliberately direct some of those resources to allow the change to move forward. It looks at how we can use the resources we have to create incentives to create changes and improvements we want. It seeks ways to mobilize people to work together in support of agreed-upon goals. It is not just "business as usual."

When people say "budget," they usually mean operational budget, not strategic budget. True, an operational budget allocates resources across the organization as well, but an operational budget may be just "business as usual." Examples: an operational budget may dole out budget increases or budget reductions across-the-board, with no specific priorities or vision for change or improvement. An operational budget may be based on simple, factual calculations (e.g., increasing S&E by a certain rate of inflation), with no value judgments being made about which areas of S&E expenditures are more valuable to the institution. An operational budget can be built to reflect known changes in current operations (e.g., who will receive salary increases due to promotions), with no effort to deliberately create change (e.g., increased funding for professional development so that current personnel can achieve new things). An operational budget may give little incentive for accomplishing changes we need or desire.

At its simplest level, "strategic budgeting" integrates the budgeting/resource-allocation (i.e., budget-building) process with strategic planning. Budgeting is a usually short-term, an annual or biennial process of tactical decisions about short-term resource allocations. Strategic planning, on the other hand, is a broader process of deciding how we will pursue our mission and our vision. While budget deals with dollars and cents, planning taps into our values, our wishes, our relationships, and our goals, our sense of what is meaningful, how we want to conduct our work, and what is possible. Planning and budgeting are integrally connected, but they are also different endeavors. Planning is a broader topic that we’ll address in a working draft on that topic. Just bear in mind that this paper deals only with budget-planning and budget-building, not with all of the other aspects of a comprehensive planning process that we will, in time, consider.

Finally, we must mention one other observation. We have noticed that one problem with UW-Green Bay’s budget process has NOT been that we have too FEW strategic plans. Rather the issue has been that we have had too MANY plans. File drawers are full of plans in a variety of areas, compiled by dedicated and talented groups. Subjects include program plans, gender equity, internationalization, diversity, facilities, general education, marketing, child care, growth plans, etc… And, while all efforts seek important ends, resource limitations require that priorities be set and that choices be made. If that is not done, then plans tend just to sit in those file cabinets. A strategic budgeting and budget-building process does so in ways that are explicit, visible, and collegial. Here, the role of the Strategic Budgeting and Budget-Building Committee is not to judge these other plans (no "thumbs up" or "thumbs down"); rather, their role is informational, to make sure that these multiple plans are considered by planning units and at the university level as the strategic budgeting process unfolds.

Hence, this strategic budgeting and budget-building process integrates planning within the existing budget-building structure. It creates room in governance and administration for change. This proposal takes our existing interest in planning and our planning methods and formalizes them. Such a process will be not only more transparent but also will allow for planning ideas to become campus realities in a context that is informed by the wider campus community. Thus planning will be linked across departments, units, and all offices.

In this paper, we’re concentrating on strategic budgeting and budget-building per se. Strategic budgeting and budget-building can be used to develop an annual budget for the campus, but it also seeks much more:

· to foster communication.

· to precipitate dialogue.

· to assure openness.

· to encourage engagement.

· to increase the levels of information and knowledge upon which decisions are based.

· to assure routine and systematic analysis of results so that we can regularly improve our attainment of the ends we care most about as a university – our mission.

One University’s faculty/staff strategic budgeting task force chose to define "strategic budgeting" this way:

Strategic budgeting is a community and constituency building process. It involves the opportunity for the inclusion of voices from the University's multiple constituencies. Strategic budgeting emphasizes the generation and preservation of assets as strategic investments. Its purpose is to develop and utilize measures of outcomes to guide decision making. Furthermore, strategic budgeting will help to clarify how each unit adds to and consumes shared resources, and contributes to the collective work necessary for achieving agreed upon missions and goals. Finally, a strategic approach to budgeting will provide incentives for: 1) generating resources and, 2) contributing to collaborative efforts (e.g., University Studies, Environmental Studies, interdisciplinary research, etc.). This approach emphasizes budgeting as an open process with full disclosure of information, assumptions, objectives, and criteria.[2]

The aspirations, then, are ambitious.  We might not get it right the first time. Better institutional decision-making will be one result of our initial efforts. As important, though, is becoming a better institution, one where we value the full and meaningful engagement of all who are the University of Wisconsin – Green Bay.

II. Strategic Budgeting and Budget-Building Principles

We propose, as a first draft, several principles as guides for UWGB’s process of strategic budgeting and budget-building. The list is not, at this stage, in priority order. Nor is it complete. We are certain that colleagues will bring to our attention critical considerations that we have overlooked. Still, here is a start:

1. Bottom-Up Engagement and Empowerment

We are a community rich in our expertise, innovative thinking, and high aspirations. Effective engagement of this important strength occurs early in the strategic budgeting and budget-building process rather than merely at the end. The budget planning process must start at the operational units (departments and offices). To the extent possible, it will use existing committees and governance structures to keep the university community fully informed and engaged, and to ensure the wide range of input needed for wise decision-making.

2. Inclusive Involvement

The strategic budgeting and budget-building process allows for effective involvement of faculty, staff, students, classified colleagues as well as external members of the UWGB community. It encourages and enables members of different groups to see "the big picture," to learn about other units, and to become involved on behalf of the whole university, not just their own assigned unit.

3. Transparency

The strategic budgeting and budget-building process is open and informative. People have access to budget, expenditure, and operational information. They are able to get information about the budgetary constraints, requirements, pressures, resources, and opportunities. They know who is responsible for making budgetary decisions, when, and by what processes they can have input. "Products" are made widely available. In short, members of the campus community know what is happening, when, and why.

4. Sensitivity

The process also is sensitive to and respectful of the worth and dignity of every individual, office, and program. This is especially important in tough budget times. Those involved in the budgeting process may have no choice but to look at possible reductions, alternatives, or changes. They have to be able to look at various "what if" scenarios--almost all of which will be found, upon reflection, not to be desirable or necessary. Yet, the mere discussion of such action can be very costly in terms of students’ and employees’ morale and confidence, sometimes producing a self-fulfilling prophecy. Somehow, we must protect our students, employees, and programs from this.

This can best be accomplished by protecting the confidentiality of such occasionally necessary deliberations and then arriving at decisions – which are public and open – in a timely manner. Thus, even as we strive toward openness as indicated in #4 above, we are also sensitive to the human implications of budgetary discussions, and we strive to achieve a delicate balance between these two important principles.

5. Governance Primacy

At UWGB, we have separate governance entities for faculty, academic staff, and students. We also have classified staff and administrators who, while they do not have a distinctive governance structure, are nonetheless vital members of our institution. All of those constituencies need to be involved in the strategic budgeting and budget-building process. Insofar as possible, we will build on, utilize, and include our existing governance entities.

6. Integration

All units and levels of the University are interconnected. The strategic budgeting and budget-building process recognizes these interconnections and incorporates them into the process. Vertically, the process integrates university-level and unit-level strategic directions. Horizontally, the process recognizes and takes into consideration the interrelations across programs, departments, and divisions, and the ways in which changes in one unit will impact on others.

7. Information-Based Thinking

The process is informed by and based on accurate, objective information and normative data. This needs to include ongoing assessments of both the internal environment/operations and the external environment. Common beliefs and assumptions need be reviewed against actual data and information—i.e., given a "reality check"—rather than taken for granted. Standard measures need to be available, and information needs to be shared both within and across units. In this manner, members of the university community will have the larger institutional context within which to interpret their own individual experiences and needs, and the solutions that emerge will be informed, realistic, accurate, and fair to the University community.

8. Responsiveness to Differences; No "One Size Fits All"

The University is a complex and dynamic organization. One planning unit will differ from the next, and one planning year will differ from the next. The University will have some areas of greater complexity and change and other areas of greater predictability and stability. Planning units will have wide guidelines (within these principles) to adopt strategic budgeting processes best suited to their particular circumstances. Likewise, the planning and budgeting processes will evolve and improve over time as we learn and as we adapt to future challenges, influences, and opportunities.

         9. Initial Simplicity

We can imagine a full-fledged planning and budgeting process that is very elaborate and thorough. After several UWGB faculty, staff, and administrators visited a campus where such a system is being implemented, however, we all agreed that such an investment of time and effort was not appropriate to our context. We have opted, instead, to start with a more minimal process. With time, we can decide what might be added and, perhaps even, what can be deleted.

These principles will help us begin the strategic budgeting and budget-building process. Clearly, this is not a "one shot" effort. The process will improve over the years. As it becomes more routine, we would expect it to link, easily and naturally, to other institutional processes such as planning, development, assessment, and evaluation. But, as our process evolves, we hope the principles outlined in this section will help keep us "on track" in developing a process that is informative, meaningful, realistic, and wise.

 

III. Strategic Budgeting and Budget-Building Process

The strategic budgeting and budget-building process will span across all divisions of the University, all organizational levels, and all governance entities. It will be comprised of both "strategic budgeting entities" and "strategic budgeting steps." Both are outlined in this section.

Strategic Budgeting Entities

1. Budget Planning and Budget-Building Stakeholders

At the campus level, each major budget division will be considered a separate planning stakeholder. These stakeholders will be responsible for submitting balanced budget models and unit plans to be considered by the Strategic Budgeting Committee and the Chancellor’s Cabinet.  These stakeholders include, at a minimum, the following:

· Academic Affairs, including, as distinct planning stakeholders:

o Liberal Arts and Sciences

o Professional and Graduate Studies

o Information Services

o Student Affairs (including Residential Life)

o Outreach and Extension

· Business and Finance (including Facilities), including:

o Weidner Center

o Union

· Advancement

· Athletics

· SUFAC

These are the major budget divisions and stakeholders at the university level. Within a particular budget division, however, there may be additional planning units that participate in the division’s planning process. In Liberal Arts and Sciences and in Professional and Graduate Studies, for instance, it is expected that each interdisciplinary budget unit will actively participate in the planning activities of the respective academic division. This is where the "bottom up" approach to planning and input into the planning process is ensured.

Thus, each budget division may decide to further organize into constituent budget-planning units. That will be the decision of the division involved. Further, there is no assumption that the exact same processes for "bottom up" budget-planning will apply to every division. Indeed, just the opposite. The process for involving those in Liberal Arts and Sciences may be quite differ from the process which SGA, Weidner Center, or Athletics decides best suits its purposes.

There also may be additional entities that cut across these budget planning stakeholders Each. Nothing precludes such additional bodies from becoming involved in formulating plans and proposals to be considered through the strategic budgeting and budget-building process. Possible examples might be initiatives contemplated by the Women’s Equality Council, the Campus or Community Diversity Councils, or the General Education Council as just a few examples.

2. Governance

Three of our major existing governance entities (faculty, academic staff, students) would have a senior leader designated to serve on the UWGB Strategic Budgeting and Budget-Building Committee (more on that follows). These individuals would be responsible for keeping their constituencies informed and for providing their constituencies opportunities for input into the strategic budgeting and budget-building process, particularly at the initial stages of the process. There is no a priori reason why each of the governance entities needs to decide upon the same type or degree of involvement; that would be up to each respective governance group.

3. Line Administrators

Line administrators [3] play several critical roles. First, they assure a process that complies with the policies of the division and the university. Second, after weighing advice, counsel, and information from various sources, they make budgetary recommendations and decisions and are held accountable for the results – for the effective performance of the responsibilities assigned to the divisions that they lead.

Budget planning is "bottom up" and recommendations are developed initially at the unit level. At that level, the unit and the line administrator should have a great deal of freedom to determine what kind of recommendations they feed into the budgeting process at the next level. Ultimately, line administrators decide what to recommend for their respective units, provide information and support relative to their recommendations, are responsive throughout the process, and are responsible for implementing the final budgetary decisions of the Chancellor who is accountable to the Board of Regents.

 

4. The Strategic Budgeting and Budget-Building Committee

The challenge is how to integrate these different stakeholders into one process. While none of us would argue that we need more committees in general, in this particular case, we believe that we do need to form a new committee. This new committee would be more inclusive and broad-based than any one of our current committees or governance entities. It would be a relatively small group of individuals with senior leadership responsibilities, either administrative or within the governance group from which they are drawn. It would be the "keeper of the process," would ensure input from all constituencies, and would evaluate and modify the process as experience tells us is appropriate or desirable.

Charge:

a. Coordinate and oversee the strategic budgeting and budget-building process by providing instructions and guidelines, timelines, advice, and comment on unit proposals and strategies.

b. Represent the various governance entities of the University by keeping constituencies informed, fostering dialog, and providing input to the discussion and process.

c. Determine information and data requirements for planning and evaluating budget proposals and reports.

d. Chair and Vice Chair participate in the university-level budget hearing process.

e. Review and critique penultimate budget proposals, including the recommendation of changes, prior to final decision-making and implementation.

f. Regularly and critically evaluate the process against strategic budgeting and budget-building principles to recommend changes and improvements.

Membership:

Precise membership will need to be worked out, but we would suggest the following.

a. The Chair of the new Strategic Budgeting and Budget-Building Committee would be a member of the University Committee. This individual will be selected by the faculty and would also serve, ex officio if not an elected representative, on the Faculty Senate. The term of office for this member will be three years.

b. The Vice Chair of the new Strategic Budgeting and Budget-Building Committee will be selected by the Academic Staff Committee from among the UWGB academic staff. The terms of office for this member will be three years and will be staggered with the term of the Chair.

c. The Assistant Vice Chancellor for Planning and Budget will serve on the committee and will provide extensive guidance, direction as to procedural/budgetary requirements, and other support to the committee.

d. The SGA President.

e. The Provost.

f. The Vice Chancellor for Business and Finance.

g. A community representative, perhaps from the Council of Trustees.

h. A member of the unrepresented classified staff. [4]

Ideally and insofar as possible, terms would be for three years to ensure continuity and experience on the committee.

Strategic Budgeting and Budget-Building Steps

Before outlining the strategic budgeting and budget-building steps that we would anticipate being involved, we need to reiterate what strategic budgeting and budget-building is and isn’t.

First, strategic budgeting and budget-building is, at the heart of it, a planning process. But, it does not substitute for—and must not be confused with—the ongoing substantive planning and improvement efforts of the various units across campus. Those plans capture how people want to improve their academic programs, student life, the workplace environment, our physical facilities, etc. They would include the academic plan, the information technology plan, the campus master plan, diversity plan, campus life plan, and unit strategic plans. We want to be clear not to confuse strategic budgeting and budget-building with the other types of planning that will, eventually, form the texture and backdrop for the annual budget planning process. Strategic budgeting and budget-building is crucial and effective, but it is only one piece of the picture.

Second, as we noted earlier, strategic budgeting and budget-building is not a neat, linear process. Those who like clear, crisp flowcharts can be driven nuts. There are top-down guidelines for bottom-up processes and multiple interacting units that must come together. Thus, we outline steps that recognize and allow for the iterative nature of the process. Although we are talking here about the strategic budgeting and budget-building process, this is where budgeting and planning come together. Hence, the steps outlined for strategic budgeting and budget-building also, at this point, begin to represent the same steps we will use for strategic planning at the University level.

Third, this is not a game of Monopoly where we all get to start at "Go." We are already well into a biennial budget process and well into our campus budget-building process. We are halfway around the game board even as we start this discussion. So, we anticipate that in this first year, we will be starting the process at about Step 3.

Having said all that, these are the various steps that seem to be required:

Step 1: University- and Division-Level Strategic Directions, Assessments, and Assumptions

Purpose: To provide context and guidance for planning and budgeting at the university, division, stakeholder, and unit levels.

Product: "Strategic directions" identify which direction the University needs and wants to go in. Strategic directions are relatively few in number, identify areas to receive particular emphasis for the university as a whole, and are most likely to be focused on a time frame of at least two or three years. One strategic direction that has been identified by Bruce, for example, is that of connecting with the community. Another (if funded) would be to grow enrollments to 7500. Others could include internationalizing the undergraduate experience, or promoting wellness, or creating 6 new nationally known centers of excellence – whatever we decide. The point is, these strategic directions are campuswide priorities that the whole institution will promote.

"Assessments" identify the major, relevant aspects of the internal and external environments—what works and what doesn’t work so well within the institution, and what special opportunities, challenges, or threats we face on the outside. This is the traditional SWOT analysis (strengths, weaknesses, opportunities, and threats) used for strategic planning in general. The assessments of the internal and external environment are short, few in number, and focused on factors most relevant to the university-level strategic directions. For the purposes of strategic budgeting and budget-building, we will pay special attention to the fiscal realities and options.

"Assumptions" must also be identified. The major assumptions are "educated guesses" that form a common framework within which the various stakeholders and units can develop their thinking. For instance, are we planning for growth in enrollments or for a steady state? Are we planning on increased funding, or reductions, and of what magnitude?

Statement of strategic directions should take no more than a half page. Assessments and assumptions should be similarly focused and concise.

Process: The Strategic Budgeting and Budget-Building Committee will establish an iterative process for engaging governance entities and the campus community in assessing the internal and external environments. The Strategic Budgeting and Budget-Building Committee will also establish an integrative process for governance entities to participate in developing or critiquing drafts of the University- and division-level strategic directions, assessments, and assumptions. The Committee then recommends to the Cabinet and Chancellor, possibly electing to include minority or divergent views. The Cabinet and Chancellor will then adopt, perhaps after modification, a set of strategic directions, assessments, and assumptions to be used in the subsequent steps. These will be distributed in writing, and all information resulting from this step will be made widely available.

Step 2: Planning-Unit-Level Strategic Directions, Assessments, and Assumptions

Purpose: To guide planning and budgeting at the planning level and to increase understanding, university-wide, of the planning unit’s direction, concerns, and needs. This is where "bottom up" planning – and, opportunities for meaningful participation – really begins. Do note that the guidance that is provided is broader than for the budgeting of dollars. Most of the resources we have to allocate involve expertise and time, not dollars; the process needs to help a unit agree upon the directions in which time and expertise as well as dollars are best invested. At this point, the unit’s strategic planning becomes integrally connected with its strategic budgeting and budget-building.

Product: Same as the university- and division-level components in type: strategic directions, assessments of relevant internal and external factors, and assumptions are identified. However, these are focused upon the needs, aspirations, and priorities of the various planning units. The planning units’ aspirations and priorities should not contradict University-level strategic directions, and some may help advance those strategic directions. Others, however, may be entirely independent of the University-level priorities and may concern matters of priority primarily for the planning unit itself. (An example of this would be the need of the Professional Program in Education to meet new Wisconsin Department of Instruction certification requirements, effective 2004.) The unit-level strategic directions, assessments, and assumptions should be focused, concise, and written.

Process: Each planning unit will develop and adopt its own process, and these likely will differ between planning units. Each planning unit will also develop the substantive plans needed to carry out its responsibilities. For example, Business and Finance will have a physical facilities plan, Academic Affairs will have an academic plan and an IT plan, Advancement and Marketing will have a marketing plan, and so forth.[6]  These substantive plans may be more long-term and general. They will inform and feed into the University’s strategic budgeting and budget-building processes, but they are distinct and distinguishable from the University’s strategic budgeting and budget-building. These substantive plans will be available to all. To promote broader understanding, they will be reviewed by the Strategic Budgeting and Budget-Building Committee, but they are the primary responsibility of the planning unit itself (as planning units are defined above).

The Strategic Budgeting and Budget-Building Committee will provide a common format for reporting and submitting the planning unit’s strategic budgeting and budget-building products. The Strategic Budgeting and Budget-Building Committee also may provide feedback on the process adopted by planning unit if the process seems not to be adequately serving general strategic budgeting and budget-building principles such as those enumerated earlier in this paper. The process adopted by the planning unit must be explicitly published (and kept up-to-date) in a form that is available to all.

While wide unit-level latitude is desirable, the established process must be consistent with university’s adopted strategic budgeting principles including opportunities of wide participation by faculty, academic staff, classified colleagues, and – as appropriate to the unit’s responsibilities – students and external community members. The process needs to allow for review, feedback, revision, and communication. All information resulting from this step will be made widely available.

Step 3: Unit-Level Strategic Budgeting and Budget-Building

Purpose: This is where inclusive "bottom up" planning in Step 2 pays off. Step 3 is intended to bring forward to the Strategic Budgeting and Budget-Building Committee the resource issues that are important to the planning units and their ability to carry out their strategic plans.

Product: Proposed budgets for the planning units, including proposed increases, reductions, or redirections.

Process: The Strategic Budgeting and Budget-Building Committee, drawing on the guidance of the Planning and Budget Office, will provide instructions on the format for submission of the proposed budget (e.g., multiple funding scenarios to be considered, scope of resources/changes to be considered, supporting information to be provided). The format may change from year-to-year, but should remain consistent enough to be user-friendly. Whatever the format, in this step the planning units must also demonstrate that their budget recommendations are clearly and explicitly connected to the products of Step 2 and, perhaps, Step 1 (i.e., to strategic directions, assessments, and assumptions).

The planning divisions and stakeholders will determine their own internal process for developing their budget recommendations, and these will vary from unit to unit. One division, for example, may involve unit directors in a series of meetings or administrative "hearings," while another division may use a more collaborative committee structure. Whatever variation a division adopts, the process must be consistent with university-level strategic budgeting and budget-building principles. Whatever process is chosen at the division level, the lead administrator for the planning division is responsible and accountable for deciding what "package" is brought forward to the next step.

In times of budget reductions, the planning divisions have a special responsibility to reach that delicate balance between the principle of transparency and the principle of sensitivity. We can achieve this by making publicly available the method, guiding principles, and overall objectives of the strategic budgeting and budget-building process, but being discrete about the particular people who might be impacted. Example: If a division is forced to consider laying off some employees, it could openly state that its objective is to reduce the budget by x%, and its guiding principles are to preserve academic integrity and the quality of campus life (or safety, or infrastructure, or material resources, or whatever). Its method could be to use a committee structure, or to have administrative review. It would be appropriate to state that a unit is looking at possibly as many as two layoffs; it would not be appropriate, at this time before any decisions have been made, to say who would be laid off. After all, at the next level, another solution might be found. All discussion within the division’s internal hearings or committee discussions must be strictly confidential.

The division administrator will be responsible for articulating how the planning unit’s budget recommendations relate to the strategic directions, assessments, and assumptions. Normally, these are public and widely available. In times of budget reductions, however, broad public dissemination would be delayed until decisions have been made.

Step 4: University-Level Strategic Budgeting and Budget-Building

Purpose: To construct an annual budget which is timely, accurate, responsive to campus needs, and consistent with the University’s strategic directions.

Product: Annual budget for the University, including budgets for the planning divisions and units, consistent with State regulations and submitted by State deadline.

Process: This is where strategic planning and budgeting come together. Division and stakeholder leaders will present the results of Steps 2 and 3, for their respective divisions and stakeholders, in university-level budget hearings. Again, Step 2 entails the units’ developing their strategic directions, assessments, and assumptions. Step 3 entails their developing budget proposals to support those strategic directions, assessments, and assumptions. Together, they should form a coherent, understandable whole.

The hearing body will include leaders of all planning divisions (to address cross-unit impacts), Cabinet, and chair and co-chair of the Strategic Budgeting and Budget-Building Committee. Division and stakeholder leaders may bring in one or two others to help with their presentation and for that portion of the hearing dealing with their presentation.

Following these hearings, the Cabinet will draft a budget plan, explicitly showing the logical connections of the budget to the strategic directions, assessments, and assumptions that were the result of Steps 1 and 2. This draft will be made widely available across campus.

The Strategic Budgeting and Budget-Building Committee will review the draft budget and provide the Chancellor with comments, concerns, or recommendations about it. In fulfilling this responsibility, the Strategic Budgeting and Budget-Building Committee can, as it wishes, devise means by which it seeks consultation with and input from the governance entities represented on the Committee.

The Chancellor will consider the advice of the Strategic Budgeting and Budget-Building Committee, consult with Cabinet, and make revisions as deemed necessary. The Chancellor then announces the University’s budget, including connections to strategic directions and the internal and external assessments with which the whole process began.

Step 5: Evaluation of Process

Purpose: To continually improve our strategic budgeting and budget-building process.

Product: A set of recommendations for improving the University’s strategic budgeting and budget-building process in the future.

Process: Soon after the conclusion of each strategic budgeting and budget-building process, the Strategic Budgeting and Budget-Building Committee will debrief, identifying what worked well and what did not work out as intended, making recommendations for changes for the next year. These could include changes in format, process, or content. Over the years, the process should become more user-friendly, more effective, and more productive. In this effort, the Strategic Budgeting and Budget-Building Committee will get input from others, as they see helpful; it is this feedback phase that is too often overlooked—but that is critical for any effective "learning organization."

 

Step 6: Analysis of Results

Purpose: To continually improve our operational effectiveness in carrying out our mission and agreed upon strategic directions, and to correct budgetary decisions that were not effective in producing the desired result.

Product:

a. Objective feedback on the University’s and the planning units’ progress toward achieving their strategic directions.

b. A rich array of relevant, objective information to inform our future actions, thinking, and planning efforts.

c. Shared understandings to promote productive consideration and discussion of our various successes and problems.

Process: At the conclusion of the planning year, each budget division and planning unit will assess its progress with respect to its strategic directions and goals. It will prepare a concise progress report or "report card." The University will do the same. These progress reports will be made available to the campus community. They will then be incorporated into the next planning and budgeting cycle.

In order to do this, each budget division and planning unit will need to identify the critical measures or indicators by which its progress can be measured. The logical connection between measure and goal should be clear. The UWGB Office of Institutional Research and the UWGB Assessment Office will assist the divisions and units in identifying reasonable measures and getting data relative to those measures. When possible and appropriate, standard and/or normed measures will be used. When appropriate and feasible, multiple measures will be used to provide a better picture. (Note: Use of the term "data" does not preclude the use of qualitative indicators when appropriate.)

Over time, we will evolve a culture in which all university personnel have easy access to the information they need to inform their thinking, decision-making, and further planning. We are disturbed at the present, for instance, by the number of times we hear people "talking past each other" because they have no agreement or common understanding of whether or not a certain problem even exists. This makes it hard to agree on what needs to be done or how we should spend the valuable, scarce resources we have. By building in this step, we’ll have an easier time agreeing what courses of action are called for and what modifications are needed to our operations.

Strategic Budgeting and Budget-Building Timeline

Timelines—what step is taken by what date—will be worked out as the outlined process is piloted, improved, and agreed upon. Timelines must allow for meaningful involvement, dialogue, and deliberation. Perhaps the timeline will differ depending upon whether the first or the second year of a biennium is under consideration. And, given that we are well into a biennial budget process, we will certainly need a compressed, one-time-only, timeline for this year. Indeed, our approach this year will likely need to be one of cutting into the process "mid-stream," say, at Step 3, then beginning with Step 1 for the next year.

Whatever, we will seek to "start simple," elaborating the process where it seems to all of us to be worth the additional investment of our shared time, energy, and expertise. As we gain more experience with this process, additional comments, criticisms, and suggestions will be sought from members of the University community. The process will be reviewed and refined further, if needed, before we launch the first full-year cycle next fall. Thereafter, the Strategic Budgeting and Budget-Building Committee will periodically review the process and recommend further refinements as needed for this process to achieve its full potential.

 

[1] Members of the Strategic Budget Planning Group include the Faculty Senate Planning and Budget Committee members Andrew Kersten (chair), William Conley, Victoria Goff, John Lyon, Joyce Salisbury, and Ray Hutchison; Chancellor Shepard; Provost Hammersmith; Assistant Chancellor Rodeheaver.

[2]Report of the Strategic Design Team,” Portland State University, May 1997, as found at:  http://www-adm.pdx.edu/user/fadm/rpt-sbdt.htm

[3] Line administrators, in this process, include, at a minimum, the heads of the planning stakeholders and the Chancellor.  Within particular planning the line administrators may develop planning processes that involve others (e.g., program chairs) in the strategic budgeting and budget-building roles required of line administrators.

[4] Representation of  most classified colleagues is problematic as they have exercised their right to be represented through unions and the process of bargaining; the UW System holds that one may choose the bargaining or the governance route but not both when it comes to seeking to influence the direction, policies, and practices of a UW institution.  In the process that follows, classified colleagues are explicitly included in the most important initial, “bottom up” steps. 

[6] We recognize that we are mixing two separate types of plans here:  plans units have for their own unit (e.g., academic plans) and university-wide plans that units have responsibility for developing and for involving the campus in developing (e.g., IT plan).